The objective of implementing of this inspection and test plan (ITP) is to provide a framework for processes and product that can be monitored for the purpose of identifying problems and establishing corrective action such that repetitive work may be avoided to reduce costs and to improve the process in order that first time acceptance of work may be accorded and help improving cash flow.
The inspection and test plan (ITP) provides the detail of the tests required by the technical specification and procedure for conducting the test at the field and the laboratory according to the standards recommended and given in the technical specification. the frequencies of test verification and recording test results using relevant formats are explained in this ITP. The ITP also provides a guideline for the inspection activities according to the contract documents, method statement, and other relevant documents. Inspections are carried out in the form of checklists that are made available. In the event of non-conformance works. The procedure is included for corrective action and resolving them.
The Inspection and Test Plan is like a Work Instruction and a Checklist is a form that becomes the actual record. Both the ITP and Checklist are documents that must be controlled.
No comments:
Post a Comment